Name of assignment/project:

Irrigation Management Improvement Project (IMIP), Project Management & Design Consultant (PMDC), Mott MacDonald Ltd (UK) in association with Euroconsult Mott MacDonald (Netherlands), Northwest Hydraulic Consultants (Canada), SODEV Consultant Ltd (Bangladesh), Under Bangladesh Water Development Board funded by ADB. Ganges Kobodok Irrigation Project area, Teesta Barrage Project area (Phase-1) and Muhuri Irrigation Project Area. Bangladesh.

Year:

May 2015 to September 2016

Location:

Bangladesh

Client:

Bangladesh Water Development Board funded by ADB.

Main project features:

Design & Drawings of Hydraulic Structures & Land use Digitization for Buried Pipe Network of Muhuri Irrigation Project (MIP). 

Positions held:

Junior Design Engineer

Activities performed:

The main assignments includes support the International and National Experts in the following aspect:

  • Field assessment of primary, secondary, and tertiary canal system in canal system
  • Design of hydraulic structure Such as Water Control Structure, Regulator, Balancing Storage Reservoir, Intake Channel and canal systems for surface
  • Preparation of standard drawing using AutoCAD
  • Preparation of Estimate and BOQ for rehabilitation and new structures
  • Collection of Spatial Data and Satellite Imagery of the project area from Primary and Secondary Sources using arcGIS.
  • Landuse feature digitization for preparing the project maps using arcGIS
  • Satellite Image and Data processing for identification of features
  • Preparation and Exporting various images/maps into different resolution and file types for specific use
  • Conditional and operational assessment of hydraulic structures in the irrigation system
  • Project Site visit with Team to find out the conditional assessment of existing structure and Agricultural condition of Project.